Robotic Beehive
J.A. Miara was tasked with placing a robotic beehive onto the roof of a parking garage in Cambridge, Massachusetts.
J.A. Miara was tasked with placing a robotic beehive onto the roof of a parking garage in Cambridge, Massachusetts.
This job started with a container on a ship and ended with crates in our storage facility, with a truck, trailer, crane, and forklift in between.
J.A. Miara was contracted to move a large rock, weighing 16,000 pounds.
The delivery of a printing press is a job that requires safe handling and careful planning.
J.A. Miara was selected to manage the full relocation of a large aerospace manufacturing facility from Massachusetts to Florida.
J.A. Miara was hired to rig and install a large fuel cell that was to be used to power the Connecticut College Campus
J.A. Miara was contracted to complete a highly challenging fuel tank rigging job for the emergency backup power system of a new construction project in Boston.