Rigging Robotics
Using our robotic dolly system and a specialized rigging forklift designed to pass through standard double-door openings, our team safely rigged and relocated a robot arm and track with precision and efficiency.
Using our robotic dolly system and a specialized rigging forklift designed to pass through standard double-door openings, our team safely rigged and relocated a robot arm and track with precision and efficiency.
Rushco and Miara were contracted to transport a total of 60 generators to a data center.
J.A. Miara’s trucking, rigging, and crane division worked together to move a modular home.
Rushco, a part of our trucking division, was recently contracted to haul a generator from IL to MA.
J.A. Miara was tasked with placing a robotic beehive onto the roof of a parking garage in Cambridge, Massachusetts.
This job started with a container on a ship and ended with crates in our storage facility, with a truck, trailer, crane, and forklift in between.
J.A. Miara was contracted to move a large rock, weighing 16,000 pounds.
This project presented unique challenges due to the oversized base skids—nearly the full length of a 40-foot container—and the tightly packed material bundles with minimal clearance on all sides.
The delivery of a printing press is a job that requires safe handling and careful planning.